SMR - The smart alternative

CIVIL APPS

CIVIL APPLICATIONS Gallery

SMR used to create a piling mat diverting contaminated spoil away from landfill SMR in use in Portsmouth 10,000 tonnes diverted from landfill, SAVING £75,000 30 tonne 360 degree excavator mixing spoil on site simple but effective On site testing in Portsmouth revealed average CBR’s in excess of 500%


Spreading SMR over surface Grind to a depth of 200mm and mix SMR material. Single pass depths of up to 300mm can be achieved Grind to a depth of 200mm and mix SMR material. Single pass depths of up to 300mm can be achieved Grind to a depth of 200mm and mix SMR material. Single pass depths of up to 300mm can be achieved Compacting levelled material to initiate remediation process. Material is 80% hard within 2 hours of compaction and 100% within 24 hours Spread and compact wear course material