SMR - The smart alternative

HANDMIXD

HANDMIXD Downloads

Utility Trench Arisings: 16 October 2007
Manchester City Council Positively Encourages The Use Of Approved Recycled Materials. Click to download complete presentation (400Kb PDF).


MATERIAL SAFETY DATA SHEET : SMR SOIL STABILISER
Click to download (31Kb PDF).


STANDARD METHOD STATEMENT
SMR Soil Stabiliser for Backfill of Excavations in Footpaths & Type 3 / 4  Carriageways

This method statement includes the use of SMR Soil Stabiliser in all backfill up to permanent reinstatement levels i.e. 60 mm from surface in flexible footpath, underside of existing in rigid and modular footpaths; & 100 mm from surface in Type 3 / 4 Carriageways. Click to download (27Kb PDF).


National Grid’s Road to Zero for Road Spoil
National Grid’s Vision is for Zero injuries, Zero occupational ill health, Zero environmental and security incidents. National Grid is committed to operating in a way that helps protect the environment for future generations, safeguards each other and those who work with us and protects the safety of the public. Our Road to Zero programme will deliver National Grid’s vision and achieve world class SHES1 performance. Click to read complete article (160Kb PDF).